HOW TO INSTALL YOUR PURE N SAFE 4 STAGE RODI SYSTEM
INSTALLATION INSTRUCTIONS:
- Remove the small blue clamp on the ro membrane housing inlet tube
- Push the collet
- While holding the collet, pull the tube out
- Open the membrane housing cap
- Watch the direction
- Insert the membrane inside the membrane housing
- Put the membrane cap back
- Tight using the membrane spanner
- Place the tube inside the fitting and push inside
- Place the clip back in place
- Now the system a prepared for connection
- Locate the cold water connection where you want to connect the system to
- Remove the existing connection
- Screw the system inlet connection
- Reconnect the water connection to the system inlet connection
- Insert the inlet valve
- Insert the 1/4′ tube to the other side of the inlet valve
- Remove the clamp and the plug from the inlet to the system
- Use scissors or a cutter
- Make sure the tube is square and free of sharp edges
- Insert the tube to the inlet water side in to the system
- Insert another tube to the product water (pure water)
- The other side of this tube will be used to collect the ultra-pure water for your fish tank
- Remove the pug in the drain line
- Connect another tube length to the drain outlet connection on the system
- Use this tube to collect the wastewater from the system
- This water is high in salt, you can use for irrigation, washing machine or wash down. Other option, through to sewer
- Now your filter is connected and ready
- Open the water inlet valve
- Flush the system for about an hour to remove preservation chemical from the system
- Check the tds with your tds pin
- Use the water for your fish tank once the tds or conductivity is below 10.
Please feel free to post you questions or comments